REVIVAL GOLD INTERCEPTS 1.8 G/T GOLD OVER 26 METERS AND PROVIDES UPDATE ON MERCUR HEAP LEACH PROJECT IN UTAH
Toronto, ON – January 7th, 2026 – Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) (“Revival Gold” or
the “Company”) is pleased to provide the latest drilling results and an update on project
development at the Company’s Mercur Gold Project (“Mercur”) in Utah.
Drilling Highlights
- Assay results have been received from an additional nineteen drill holes with the following
highlight intersections in near-surface oxide gold mineralization at Mercur:
o 1.8 g/T gold over 25.9 meters width at 6.1 meters downhole in RM25-144;
o 1.3 g/T gold over 21.9 meters width at 16.8 meters downhole in RMC25-019; and,
o 0.7 g/T gold over 29.0 meters width at 21.3 meters downhole in RM25-131. - Results to date continue to confirm the expected tenor and leachability of mineralization
and demonstrate exploration upside opportunities at Main Mercur.
Development Update - Revival Gold’s lead environmental and permitting consultant, Stantec Consulting Inc.
(“Stantec”), has completed detailed work plans for baseline biological studies. Field work
will commence in Q1 and is expected to be completed over the next…Read Full Revival Gold PDF Press Release