8.0 G/T OVER 12 METERS AT THE MERCUR GOLD PROJECT IN UTAH

Toronto, ON – April 7th, 2026 – Revival Gold Inc. (TSXV: RVG, OTCQX: RVLGF) (“Revival Gold” or
the “Company”) is pleased to provide final results from the 2025 drilling program at the Company’s
Mercur Gold Project (“Mercur” or the “Project”) located in Utah.
Highlights
- Highlight intercepts at South Mercur include:
o 2.8 g/T gold over 74 meters width at 91 meters downhole in RMC25-031; including
8.0 g/T gold over 12 meters width at 130 meters downhole;
o 1.1 g/T gold over 84 meters width at 14 meters downhole in RMC25-032; and
o 1.0 g/T gold over 82 meters width at 13 meters downhole in RMC25-033. - High grade intercept in RMC25-031 is one of three known ore shoots at South Mercur that
are prospective for future exploration at depth. - Encountered mineralized waste rock from historical in pit backfill not in the current
resources:
o 0.5 g/T gold over 38 meters width starting at surface in RM25-171; and
o 0.4 g/T gold over 17 meters width starting at surface in RM25-172. - Revival Gold continues to encounter high grades at South Mercur which further highlights
the exploration potential of Mercur.
“Carlin style gold systems, like Revival Gold’s Mercur, are known to generate high-grade ore shoots
that have driven huge amounts of value for the major gold producers in Nevada. As demonstrated
with today’s 8 g/T gold over 12 meters intercept, Revival Gold is seeing intact high grades zones at
South Mercur. The shoots not only benefit our current heap leach project but provide an exciting
exploration opportunity on Mercur’s large 7,200-hectare property”, said Hugh Agro, President &
CEO.
Mr. Agro continued, “These are the final results from 2025. The Company plans to resume drilling
at Mercur later this month and the drills continue to turn at Beartrack-Arnett in Idaho targeting
high-grade underground material at Joss. 2026 should be a big year for Revival Gold”.














































